4 May 2012

Project Completed - George Street, Bicester


This project has now been successfully completed.

Another project for Sanctuary Housing has started on site, providing 4 new homes. The new dwellings are a mix of 2 and 3 bedrooms which are designed to meet Level 3 of the Code for Sustainable Homes.






30 April 2012

Pool Cabana

A small pool cabana project in Oxfordshire has reached practical completion. The small project provides a changing room, gym and kitchen facilities next to an outdoor swimming pool. Pool plant and equipment storage is hidden from view and a sun sail provides shade to the South facing patio area.


23 March 2012

Buchanan Court

Buchanan Court has been handed over to Sanctuary Housing. The project of 6 dwellings built to Level 3 of the Code for Sustainable Homes has been completed by Leadbitter.



6 February 2012

Peugeot Preston & Peugeot Stockport

The refurbishment works have now been completed.






Two projects for Peugeot have started on site with MCS Build as contractor on both projects. The projects involve extensive refurbishment to existing dealerships.



23 January 2012

Pool Cabana

Works have started on site for a small pool house project in Oxfordshire. The project provides gym, changing room, and kitchen facilities to and outside swimming pool.